Determined resource limits from borehole data. Developed mine plan based on stripping ratios and geographic constraints. Prepared construction level grading and reclamation plans detailing finished topography for wetland development.

kazan soda project

rÍo tinto, turkey

Prepared pre-feasibility reports for proposed trona mine. Designed process/solution cooling ponds. Developed material and liner system technical specifications. Coordinated liner laboratory testing program.

o'neal quarry

chemical lime company, alabama

Supervised crews on day and night shift, managed the contract driller and contract blaster, completed quarry sequencing plans based on the varying demands of 2 lime plants and 7 different quality seams, managed the quality control program, completed all blast designs for the quarry, created the annual mine plan and budget, and filled the position of Quarry Manager during vacations.

ochoa project

intercontinental potash corp., new mexico

Completed a detailed start-up and ultimate design and cost estimate for the dry stack tailings facility which was sized to hold 75 million tons of material. Also, completed the preliminary design layout and cost estimate for the evaporation pond field which was sized for over 4,000 acres.

КОНТАКТЫ

600 Grant Street, Suite 975

Denver, CO 80203 USA

​​

Кевин Гунеш:               +1-303-547-6587

Терри Лейн:                 +1-720-373-5911

Ларри Брекенридж:    +1-720-490-6168

Рик Мориц:                  +1-303-704-2589​

Луис Квириндонго:      +1-303-249-0633

info@global-resource-eng.com

  • Black Facebook Icon
  • Black LinkedIn Icon

Ваше ФИО

Адрес электронной почты

Тема

Письмо

© 2020 Global Resource Engineering